Member Login

Autoclave Service Contracts

  • Db0133 Website Images 1280X50019

Autoclave Service Contracts

The Provision and Use of Work Equipment Regulations (PUWER) 1992 states that equipment must be serviced and maintained in accordance with the manufacturers' recommendations.

  • Records of servicing, inspection and user validation checks must be kept and audited
  • All members of staff must be fully trained in the safe operation of equipment prior to use
  • DBG service selected autoclaves from the following manufacturers: Burtons, Eschmann, Excel and Faro.
  • We have created a number of service contracts designed to meet your individual practice requirements.

To service an autoclave in line with the manufacturer’s guidelines which includes both repair and preventative maintenance and the replacement of components which, in the opinion of the Engineer are worn or defective.

Calendar Orange How often do I need my Autoclave servicing and inspecting?

The majority of manufacturers recommend a service every 12 months,
however some practices have them as often as once a quarter.

Clock Orange How long will it take?

It usually takes around 2 hours to do a service on an Autoclave.

Pound Orange How much do you charge?

Level 1 From £92.00* plus VAT
A thorough annual service of your autoclave

Level 2 From £230.00* plus VAT
A thorough service of your autoclave twice a year
Pressure Vessel Inspection and Certification of your autoclave
Updates on training during visits.
Thermocouple test verification as per HTM 01-05 on service visits.

Level 3 From £269.00* plus VAT
A thorough service of your autoclave twice a year
Pressure Vessel Inspection and Certification of your Autoclave
Free emergency breakdown cover
Free spare parts up to the value of £150 per annum if required (door seals excluded)
Thermocouple test verification as per HTM01-05 requirement at every visit
Updates on training during any visit.

*Dependent on Brand and Service kit required

Person Orange What does our Engineer actually do?

  • Check serial number
  • Remove cover
  • Check for signs of steam/water leaks
  • Drain and clean reservoir
  • Check reservoir water level sensor
  • Remove and clean tray carrier
  • Remove any debris from under the element (burrs etc)
  • Remove the water level sensor and clean
  • Replace washers
  • Replace the water level sensor if necessary
  • Clean the chamber and door face
  • Strip and clean the filter (fitted into the chamber)
  • Strip and clean the door plate
  • Replace the door seal
  • Lightly lubricate door seal with silicon grease
  • Check the door micro switch operation and adjust if required
  • Check door rack, wedges and clamps for wear
  • Check electrical connections (mains cable and fuse connections etc.)
  • Refill reservoir with distilled/deionised water
  • Thoroughly clean the exterior of the vessel where possible
  • Inspect all welds for signs of corrosion
  • Check all joints and seals for leaks
  • Remove the safety relief valve
  • Note the safety relief valve marked value
  • Test the pressure of the safety relief valve
  • Replace the safety relief valve and ensure it seats correctly
  • Fit temperature probe
  • Run test cycle 134˚C without drying (target temperature 135.5˚C + 1˚C)
  • Thermocouple Test
  • Check for steam/water leaks
  • Verify the temperature gauge is working correctly
  • Verify the pressure gauge is working correctly
  • Verify pressure door lock operation
  • Verify electrical door bolt operation
  • Remove temperature probe (ensure cover of the test port is replaced)
  • Refit cover and clean the outside of the autoclave if necessary
  • Complete all paperwork
Callhandlers 120Px5

Call or Email Us

Speak to our team today on 0800 028 1697

Email sales@thedbg.co.uk

Engineering Enquiry